Mughal Road Projects

Work-wise/location-wise Revised Action Plan in respect of Mughal Road Project under Capex Budget 2020-21
S.No. Activity (Code) Name of the work activity wise Location Approved outlay
for 2020-21
Revised Estimates
2020-21
Funds released during
2020-21
1 16100030 Providing/Laying of 150MM Thick Wet Mix , 50MM Thick Macadam and 25MM Thick Semidense including 6MM Thick Seal Coat OF MUGHAL ROAD including road line marking (A) From Buffliaz Side = RD 0+00 to RD 43+600 BT Work (B)From Shopian Side KM (RD 0+000 to RD 40+550 BTwork) Buffliaz (Poonch Side):- Km 13+000 to 20+000
Km 27+000 to 33+000
KM 35+000 to 43+600

Shopian Side:-
Km 0+000 to 9+000
Km 25+000 to 40+550
2500.00 2200.00 1250.00
2 16100013 Providing /laying of create work for retaining of slopes at required spots. (a). From Pushana to Pir Ki Gali =4.00KM (b). From Pir Ki Gali to Dubjan =2.50KM Buffliaz Side :-
Km 38+000 to 43+600
Km 11+000 to 27+000
Km 32+000 to 38+000
Km 5+500 to 11+000
Km27+000 to 32+000
150.00 160.00 150.00
3 Add W.C Contingencies and Consultancy Charges @3% - 30.00 50.00 0.00
4 Clearance of snow at spots by MED , MED Claim for Clearance of snow during 2019-20 /Spreading of salt after clearance of Snow .
Km 0+00 to 40+550 (Shopian Side)
Km 0+00 to 43+600 (Buffliaz Side)
KM 84.10 40.00 50.00 0.00
5 Removal of Slips/Slides/Surcharge/De-Silting of Culverts./Restoration of damaged Berms/ Clearance/clearanceof drains at various /Cloud Burst/Clearance of deposited Mulba from Choked Culverts, spots. Buffliaz (Side)
km 1+050 to 1+076
km 1+650 to 1+670
km 2+120 to 2+910 to 3+930
km 16+000 to 22+000
km 15+580to 15+612
km 16+980 to 17+005
km 20+150 to 20+230
km 20+700 to20+750
km22+00 to 27+000
km 2+380 30+740 to 30+850
km 31700 31+780
km32+00 to 3500+00
km 40+920 to 41+120

Shopian Side :-
Slips/slides/culverts: 12+000 to 38+000

Berms/Drains:
0+000 to 3+000
240.00 220.00 0.00
6 Reconstruction/Construction of R/Wall, B/Wall at various spots/Construction of Gabion Walls at various locations incld. Cost of Gabions and cost of soil /Filling of stones into wire mesh crates for stabilization of soil/Fixing of kilometre stones /RD Stones/Construction of damaged railing of Bridges/Painting/Construction of PCC drains at various spots/Fixing of Crash Barriers incld. Retro reflective films at spots/ R/Walls:
40+920 to 41+120

B/walls:
12+000 to 30+000

Gabbions:
16+000 to 19+000

Crash Barrier:
0+600 to 6+000
13+000 to 18+600
22+000 to 27+000
29+000 to 31+000
31+000 to 36+000


PCC Drains:
4+000 to 8+000
270.00 160.00 0.00
7 Repair of damaged sign boards and supply/fixing of new sign boards/Repairs of passengers shed constructed along the road/Construction of parapets over the existing R-wall at required spots/Construction of temporary diversions at various spots/Repair/Maintenance/Construction of CD works/Repair/Renovation of Buildings etc./Constt of Snow Dett . Repair and revovation of Vip Hut Chandimarh

Repair and revovation of VIP Hut Surankote Repair and Revovation of Divisional Office Surankote

Repair of Snow dett.
Sign boards 2+000 to 40+550
Parapets 12+000 to 32+000
Buildings: Lalmandi Srinagar, chowgam shopian, dubjan, Pir-Ki-Gali
60.00 80.00 0.00
8 Provision for improvement of Bye-Pass at Avalanche Prone Stretche/Improvement of damaged Road Surface b/w of GSB filling & P/L of WBMG-II in Patches /Stretches & Rectification of Damaged road Surface b/w of P/l 50 mm Thick macadam & 25 mm thick semidence in patches/stretches and Re-allignment of Road from RD 0+000 to15+000 (Buffliaz Side) RD: 19+200 to 19+600 (Dubjan Curve Shopian Side). Km, 0+000 to 40+200 , 2+600 to 2+740

Dubjan curve
19+200 to 19+600
160.00 250.00 0.00
9 Rectification of damaged road surface on temporary basis 9+000 to 25+000 20.00 25.00 0.00
10 Widening of Blind Curves at Accidential prone areas at various spots. 30.00 27.00 0.00
Total 3500.00 3222.00 1400.00