Prime Minister’s Development Package (PMDP) 2015

The Hon’ble Prime Minister had on 07.11.2015 announced, a Reconstruction Plan for J&K involving an outlay of Rs. 80,068 Crore. The Reconstruction Plan essentially rests on five Pillars- Humanitarian Relief, Crisis Management, Social Infrastructure Development Projects and Economic Infrastructure. The Reconstruction Plan aims at expanding economic infrastructure, expanding provision of basic services, providing thrust to employment and income generation and providing relief and rehabilitation to the victims of September, 2014 floods and to strengthen Disaster Management Framework of the State. The Reconstruction Plan also seeks to strengthen the road infrastructure development projects in the J&K. Accordingly, 15 projects were sanctioned with a total cost of Rs 36938 Cr.

The details of the projects sanctioned under PMDP Programme

Projects in Hon'ble Prime Minister’s Development Package for the re-construction of Flood Damaged Infrastructure in the State.

S. No Name of the Project PMDP Cost (Rs in Crore) Ministry Implementing Agency Status % Phy Progress. Remarks
1 Special Repairs to roads, buildings and within BB Cantt Kalai Bridge on River Poonch, Sukhato Bridge, Bridge on NH 144A at km 150.50 57.00 MoD SAMPARK Work in progress, Kalai Bridge completed Sukhtao Bridge 60.40% Dassal Bridge 56.20%
2 Upgrading Srinagar-Uri-LOC Road, Double lanning of Srinagar-Leh road via Kargil and Uri-Kamanpost (LOC) 420.60 MoD BEACON Ongoing

96.48

99

94.92
Srinagar Baramulla –Uri Road = 94KM
Uri-LOC Road = 17.25 KM
Srinagar Sonamarg Gumri =78 KM
3 Projects proposed to be taken-up under Bharat Mala for Length of about 105 Kms covered under Tourist Connectivity. 2700.00 MoRTH NHIDCL Baramulla Gulmarg road Mobilization of man & machinery is in progress. 5% Work on the 05 no. Culverts started land acquisition process started. Matter taken up with MoRTH for improvement of Gradient and Design Curve
4 Jammu-Akhnoor –Poonch (2 Lane PS/ 4 Lane) Package-1 4th Tawi Bridge to Canal Head (Km0.00 to 0.080 Km) 5100.00 MoRTH NHIDCL Ongoing

40.15%

8.77%
Pkg-II Canal Head to Ganesh Vihar ( KM0.0800 to 6.00KM)
Pkg-III A Ganesh Vihar to Akhnoor Bridge ( KM6.00 to 26.350 KM
Pkg-III B Khati Chowk Akhnoor Bridge to Nanuman Chowk (KM 26.350 to 30.097 KM
5 Akhnoor –Poonch (2 Lane PS/ 4 Lane) Work divided into 8 Pkgs. SAMPARK ongoing Pkg –IV 11%
6 Chennani-Sudhmahadev-Goha including 3.0 Km long tunnel (2 Lane PS) 2100.00 MoRTH NHIDCL Ongoing 36%
7 Construction of Semi-Ring Road in Jammu 2024.00 MoRTH NHAI Ongoing 40.62
8 Construction of Semi-Ring Road in Srinagar 1860.00 MoRTH NHAI Not started
9 Udhampur-Ramban (JK) (km 67.00 to km 89.00, km 130.00 to km 151.00) 2137.00 MoRTH NHAI Ongoing 70%
10 Construction of double lane and Batote-Kishtwar-Sinthanpass-Anantnag (NH-1B, now NH-244) 130.00 MoRTH NHIDCL completed
11 Ramban-Banihal (JK) (km 151.00 to km 187.00) 2169.00 MoRTH NHAI Ongoing 26.05
12 4-lanning of Srinagar-Banihal section of NH-1A (km 187 to km 189.35 & km 220.7 to km 286.11) 735.00 MoRTH NHAI Ongoing 90
13 4-lanning Qazigund-Banihal Section of NH-1A (Km 189.35 to 204.70) (Tunnel Project 8.45 km & 069 length 2-lane) 1987.00 MoRTH NHAI Ongoing 95.20
14 Srinagar-Shopian-Qazigund NH-444 (2-Lane PS + Major Bridges) 1800.00 MoRTH State R&B In progress 70
15 Zozila Tunnel 9090.00 MoRTH NHIDCL In- progress Work in progress
16 4-lanning of Chenani-Nashri Section of NH-1A (km 89 to 130) (Tunnel project-9 km long tunnel 2-lane) 781.00 MoRTH NHAI Completed