Statement showing the details of works executed during 2020-21 and liability of 2019-20 Shri Amarnathji Yatra

R&B Department, Kashmir
S.No. Name of the work Estimated Cost
(Rs in lakhs)
Work done 2020-21 Remarks
A New Works 2020-21
Baltal Side
Nilgrath to Y-Junction
1 Lanching of Bailey bridge at Nilgrath  for Shri Amarnath Ji yatra 2020 18.65 18.65 Work completed
  Total Nilgrath to Y.Junction 18.65 18.65  
Ranga Morh to Dumail
1 Restoration of road from Ranga Junction upto Dumail b.w.o clearance of Slips, construction of kacha drain, P/L of GSB, WBM G-II in P/S and protection works at required spots for Shri Amarnath Ji Yatra 2020 (RD0-2000M). 2.27 2.27 Work completed
2 Restoration of road from Ranga Junction upto Dumail b.w.o   construction of kacha drain, P/L of GSB, WBM G-II in P/S and protection works at required spots for Shri Amarnath Ji Yatra 2020 (RD 2000-4000M). 1.84 1.84 Work completed
4 Restoration of road from Baltal upto Dumail b.w.o Create protection work (km 4th-7th RD 4000-RD6200M incl. kacha drain and general maintanence on road surface for Shri Amarnath JI Yatra 2020.   3.29 3.29 Work completed
5 Restoration of Baltal base Camp pony yard,parking zone (approach) buffer zone near  Baltal  Bridge b.w.o P/L GSB , and other allied works of same nature at required spots incl. removal of slips and garbage incl. clearance choked drains/ pipes for Shri Amarnath Ji Yatra 2020. 2.96 2.96 Work completed
6 P/F of buffer zone b.w.o  barbed wire fencing  incl. fixing of CGI sheets and other allied works of same nature at Dumail  incl. removal of slips and garbage  for Shri Amarnath Ji Yatra 2020. 3.93 3.93 Work completed
7 Repair to Existing ACG , X-ray baggage ,shelter shed at Baltal and Dumail damaged due to snow fall 4.30 4.30 Work completed
8 Lanching de-lanching of Bailey bridge at Baltal  for Shri Amarnath Ji yatra 2020 4.75 4.75 Work completed
  Total Ranga Morh to Dumail 23.34 23.34  
Dumail Sansanitop
1 Removal of snow from  Dumail-Sansanitop track b.w.o Clearence of Snow/Snow Avalanches  for Shri  Amarnath Ji Yatra 2020  Km Ist to Km 3rd).Dumail to Railpathri(RD0-3000)Mtrs. 1.20 1.20 Work completed
2 Removal of snow from   Dumail-Sansanitop track b.w.o Clearence of Snow/Snow Avalanches  for Shri  Amarnath Ji Yatra 2020  Km 3rd to Km 6th) railpathri to Barimarg.(RD 3000-6000) Mtrs. 1.56 1.56 Work completed
3 Removal of snow from  Dumail-Sansanitop track b.w.o Clearence of Snow/Snow Avalanches  for Shri  Amarnath Ji Yatra 2020  Km 6th to Km 8th)  Barimarg to Sangam.(RD6000-8000)Mtrs. 1.25 1.25 Work completed
4 Removal of snow from  Dumail-Sansanitop track b.w.o Clearence of Snow/Snow Avalanches  for Shri  Amarnath Ji Yatra 2019-20  Km 8th to Km 11th).Sansanitop.(RD 8000-10500)Mtrs. 1.30 1.30 Work completed
5 Restoration of Dumail - Sansitop Track km 1st to 3rd )RD 0-2100 M) b.w.o clearance of slips, protection works at required spots incl. ganeral maintanance during yatra period. 4.12 4.12 Work completed
6 Restoration of Dumail - Sansitop Track (RD 2100-3000 ) b.w.o clearance of slips, protection works  at required spots incl. ganeral maintanance during yatra period. 1.56 1.56 Work completed
7 Restoration of  Dumail -Sansanitop Track (RD 3000-4500M) (Km 4th-5th) b.w.o clearance of slips, protection works at required spots incl. ganeral maintanance during yatra period. 3.55 3.55 Work completed
8 Restoration of  Dumail -Sansanitop Track (RD 4500-6000M) (Km 5th-6th ) b.w.o clearance of slips, protection works at required spots incl. ganeral maintanance during yatra period. 3.37 3.37 Work completed
9 Restoration of Dumail - Sansitop Track km 6th to 8th b.w.o clearance of slips, protection works  at required spotsincl. ganeral maintanance during yatra period. 2.64 2.64 Work completed
10 Restoration of Dumail - Sansitop Track (RD 8000-9000 M) incl. panjtarni emergency exit track b.w.o clearance of slips, protection works at required spots incl. ganeral maintanance  during yatra period. 3.69 3.69 Work completed
11 Restoration of Dumail - Sansitop Track (RD 9000-10500 M) b.w.o clearance of slips, protection works  at required spots incl. ganeral maintanance during yatra period. 2.16 2.16 Work completed
12 Removal of protruding bolders along the track in Km 2nd and Km 3rd incl. P/L of RCC steps in Km 6th. 8.55 8.55 Work completed
13 Construction of 2-No. sheds for storage of materials on Dumail sansanitop track.(Balance) to be taken after Yatra. 15.00 15.00 Work completed
14 Widening of track at Dumail-Sansanitop track from Km Ist to 4th at required spots  making Width more than 12'.00" Feet  for Shiri Amar nath ji yatra 2020.(Post Yatra) 18.00 18.00 Work completed
15 Installation of gabbion mesh on timber post on Dumail-sansanitop track from Km 2.5 to Km 4 for Shri Amarnath Ji yatra 2020.  1.78 1.78 Work completed
16 Installation of gabbion mesh on timber post on Dumail-sansanitop track from Km 4 to Km 6 for Shri Amarnath Ji yatra 2020.  1.30 1.30 Work completed
  Total Dumail to Sansanitop 71.03 71.03  
Kali Mata Track
1 Removal of snow from   Kali mata track b.w.o clearence of snow/snow avalanches from RD 0-3500 for Shri Amarnath Ji yatra 2020 0.83 0.83 Work completed
2 Restoration of kali Mata Track  b.w.o clearance of slips, protection works, lanching and repair  of  03-No.bridges and allied works at required spots for Shri Amarnath Ji yatra 2020 RD 0-800 Mtrs. 3.80 3.80 Work completed
3 Restoration of kali Mata Track  b.w.o clearance of slips, protection works, lanching and repair of   01-No.bridge and allied works at required spots for Shri Amarnath Ji yatra 2020 RD800-1600 Mtrs. 4.43 4.43 Work completed
4 Restoration of kali Mata Track  b.w.o clearance of slips, protection works, lanching and repair of    03-No. bridges and allied works at required spots for Shri Amarnath Ji yatra 2020 RD1600-3200 Mtrs. 2.80 2.80 Work completed
  Total Kali Mata Track 11.86 11.86  
Railling Works
1 Supply  of pannel/pedestral made out of ISMC channels 75x40 mm & 100x50 mm of required size and specipication of M.S pipes, 40 mm dia incl. cutting welding incl. Cost of  carriage, washer, nut and bolts  for Shri Amarnath Ji yatra 2020( for a length of 2 Kms.(Supply upto Stores).Incl. fixing of same.(RD 3000-6000 &6000-8000) Mtrs.Agg.length=1.5Km +0.5 Km) 97.50 97.50 Work completed
2 Errection of  safety railing at vulnerable spots incl. fixing of old posts, pipes , Painting & concreting etc on  Kali mata  track from RD 0-3500  Mtr. For  Shri Amarnath Ji yatra 2020.(Linear Length=2 Kms) material to be taken from near by site.(Part B) Concreting to railings including strengthening  5.75 5.75 Work completed
3 Errection of  safety railing at vurnable spots incl. fixing of old posts, pipes, Painting & concreting etc  on  Dumail-Sansani top track from RD 0-3000  Mtr. For  Shri Amarnath Ji yatra 2020.(2.00 Kms out of which 1.00 Km material available at site & 1.00 Km to be taken from Store).(Part B) Concreting to railings including strengthening  7.50 7.50 Work completed
4 Errection of  safety railing at vurnable spots incl. fixing of old posts, pipes ,Painting & concreting etc on  Dumail-Sansani top track from RD 3000-6000  Mtr. For  Shri Amarnath Ji yatra 2020.(1.5 Kms.material  to be taken from near by site).(Part B) Concreting to railings including strengthening  8.00 8.00 Work completed
5 Errection of  safety railing at vurnable spots incl. fixing of old posts, pipes Painting & concreting etc on  Dumail-Sansani top track from RD 6000-8000  Mtr. For  Shri Amarnath Ji yatra 2020.(1.00 Km material   to be taken from near by site). (Part B) Concreting to railings including strengthening  6.00 6.00 Work completed
6 Errection of  safety railing at vurnable spots incl. fixing of old posts, pipes ,Painting & concreting etc  on  Dumail-Sansani top track from RD 8000-10500  Mtr. For  Shri Amarnath Ji yatra 2020. (2 Kms material to be taken from near by site).  (Part B) Concreting to railings including strengthening  7.00 7.00 Work completed
  Total Railling Works 131.75 131.75  
Other allied works
1 Manufacturing, providing and installation of Retro reflectized signage system on roads during Yatra-2020 9.00 9.00 Work completed
2 Supply of ponies pre, during, and post Yatra for inspection  on track by  staff incl. visit of officers on track during Yatra-2020 4.00 4.00 Work completed
3 Arrangement/supply of vehicle for inspection of  staff  at various sites during Yatra-2020 2.00 2.00 Work completed
4 Consultancy charges for framing of DPR for stability of Hill slopes around Holy cave and Km 3rd to Km 6th of Dumail sansanitop track 9.50 9.50 Work completed
  Total allied works 24.50 24.50  
  Total Ganderbal Division 281.13 281.13  
1 Arrangement at Transit accommodation camp at Panthachowk 5.96 5.96 Work completed
  Total  5.96 5.96  
Pahalgam Side
2 Making necessary arrangements for Shri Amarnath Yatra 2020 at FCI Godown Mir Bazar Anantnag 6.00 6.00 Work completed
  Total Khanabal Division 6.00 6.00  
  Total new proposal 2020-21 293.09 293.09  
B Unpaid work done liability 2019-20
1 Maintenance of Pahalgam/Chandanwari road incld. restoration of damaged spots at Chandanwari Camp of Shri SANY 92.00 92.00 Work completed
2 Upgradation of yard/inner roads bwo GSB filling incld. P/L of WBM G-II in paremises of Walnut Factory at Qazigund 8.77 8.77 Work completed
3 Face lifting bwo painting/distempering R&B Residential Quarter & SDPO's Office incld repairs to railing & bathrooms 1.08 1.08 Work completed
4 Construction of 01 No. Room with 02 No washrooms & varanda (Yatra facilitation centre) at Jawahar Tunnel (Qazigund side) 6.19 6.19 Work completed
5 Construction of parking place bwo GSB filling & P/L of WBM G-II at Lower Munda near Zig 5.18 5.18 Work completed
6 Furnishing bwo thermocool and axcel matting R&B to Residential & PHC at Lower Munda 0.59 0.59 Work completed
7 Construction of dropage at Bonigam junction, improvement to road surface bwo nallah muck filling in the premises of Migrant Colony at Vessu 1.54 1.54 Work completed
8 Refilling of nallah much/RBM including extra filling for providing entry/exit for vehicles of Industrial Estate Vessu 0.65 0.65 Work completed
9 Arrangement of Shri Amarnathji Yatra transit camp 2019 by way of CGI sheds at Pantha Chowk Srinagar (constrution of additional sheds by Construction Division 1st Srinagar) 29.08 29.08 Work completed
10 Constr.of temporary barracks/sentry posts for accomodating of incoming security forces for SANJY 2019-20 at Shadipora camp and indoor stadium Shadipora/ training ground near 14 BN CRPF 30.12 30.12 Work completed
  Total work done liability 2019-20 175.20 175.20  
  G.TOTAL 468.29 468.29