S.No. | Name of the work |
Estimated Cost (Rs in lakhs) |
Work done 2020-21 | Remarks |
A | New Works 2020-21 | |||
Baltal Side | ||||
Nilgrath to Y-Junction | ||||
1 | Lanching of Bailey bridge at Nilgrath for Shri Amarnath Ji yatra 2020 | 18.65 | 18.65 | Work completed |
Total Nilgrath to Y.Junction | 18.65 | 18.65 | ||
Ranga Morh to Dumail | ||||
1 | Restoration of road from Ranga Junction upto Dumail b.w.o clearance of Slips, construction of kacha drain, P/L of GSB, WBM G-II in P/S and protection works at required spots for Shri Amarnath Ji Yatra 2020 (RD0-2000M). | 2.27 | 2.27 | Work completed |
2 | Restoration of road from Ranga Junction upto Dumail b.w.o construction of kacha drain, P/L of GSB, WBM G-II in P/S and protection works at required spots for Shri Amarnath Ji Yatra 2020 (RD 2000-4000M). | 1.84 | 1.84 | Work completed |
4 | Restoration of road from Baltal upto Dumail b.w.o Create protection work (km 4th-7th RD 4000-RD6200M incl. kacha drain and general maintanence on road surface for Shri Amarnath JI Yatra 2020. | 3.29 | 3.29 | Work completed |
5 | Restoration of Baltal base Camp pony yard,parking zone (approach) buffer zone near Baltal Bridge b.w.o P/L GSB , and other allied works of same nature at required spots incl. removal of slips and garbage incl. clearance choked drains/ pipes for Shri Amarnath Ji Yatra 2020. | 2.96 | 2.96 | Work completed |
6 | P/F of buffer zone b.w.o barbed wire fencing incl. fixing of CGI sheets and other allied works of same nature at Dumail incl. removal of slips and garbage for Shri Amarnath Ji Yatra 2020. | 3.93 | 3.93 | Work completed |
7 | Repair to Existing ACG , X-ray baggage ,shelter shed at Baltal and Dumail damaged due to snow fall | 4.30 | 4.30 | Work completed |
8 | Lanching de-lanching of Bailey bridge at Baltal for Shri Amarnath Ji yatra 2020 | 4.75 | 4.75 | Work completed |
Total Ranga Morh to Dumail | 23.34 | 23.34 | ||
Dumail Sansanitop | ||||
1 | Removal of snow from Dumail-Sansanitop track b.w.o Clearence of Snow/Snow Avalanches for Shri Amarnath Ji Yatra 2020 Km Ist to Km 3rd).Dumail to Railpathri(RD0-3000)Mtrs. | 1.20 | 1.20 | Work completed |
2 | Removal of snow from Dumail-Sansanitop track b.w.o Clearence of Snow/Snow Avalanches for Shri Amarnath Ji Yatra 2020 Km 3rd to Km 6th) railpathri to Barimarg.(RD 3000-6000) Mtrs. | 1.56 | 1.56 | Work completed |
3 | Removal of snow from Dumail-Sansanitop track b.w.o Clearence of Snow/Snow Avalanches for Shri Amarnath Ji Yatra 2020 Km 6th to Km 8th) Barimarg to Sangam.(RD6000-8000)Mtrs. | 1.25 | 1.25 | Work completed |
4 | Removal of snow from Dumail-Sansanitop track b.w.o Clearence of Snow/Snow Avalanches for Shri Amarnath Ji Yatra 2019-20 Km 8th to Km 11th).Sansanitop.(RD 8000-10500)Mtrs. | 1.30 | 1.30 | Work completed |
5 | Restoration of Dumail - Sansitop Track km 1st to 3rd )RD 0-2100 M) b.w.o clearance of slips, protection works at required spots incl. ganeral maintanance during yatra period. | 4.12 | 4.12 | Work completed |
6 | Restoration of Dumail - Sansitop Track (RD 2100-3000 ) b.w.o clearance of slips, protection works at required spots incl. ganeral maintanance during yatra period. | 1.56 | 1.56 | Work completed |
7 | Restoration of Dumail -Sansanitop Track (RD 3000-4500M) (Km 4th-5th) b.w.o clearance of slips, protection works at required spots incl. ganeral maintanance during yatra period. | 3.55 | 3.55 | Work completed |
8 | Restoration of Dumail -Sansanitop Track (RD 4500-6000M) (Km 5th-6th ) b.w.o clearance of slips, protection works at required spots incl. ganeral maintanance during yatra period. | 3.37 | 3.37 | Work completed |
9 | Restoration of Dumail - Sansitop Track km 6th to 8th b.w.o clearance of slips, protection works at required spotsincl. ganeral maintanance during yatra period. | 2.64 | 2.64 | Work completed |
10 | Restoration of Dumail - Sansitop Track (RD 8000-9000 M) incl. panjtarni emergency exit track b.w.o clearance of slips, protection works at required spots incl. ganeral maintanance during yatra period. | 3.69 | 3.69 | Work completed |
11 | Restoration of Dumail - Sansitop Track (RD 9000-10500 M) b.w.o clearance of slips, protection works at required spots incl. ganeral maintanance during yatra period. | 2.16 | 2.16 | Work completed |
12 | Removal of protruding bolders along the track in Km 2nd and Km 3rd incl. P/L of RCC steps in Km 6th. | 8.55 | 8.55 | Work completed |
13 | Construction of 2-No. sheds for storage of materials on Dumail sansanitop track.(Balance) to be taken after Yatra. | 15.00 | 15.00 | Work completed |
14 | Widening of track at Dumail-Sansanitop track from Km Ist to 4th at required spots making Width more than 12'.00" Feet for Shiri Amar nath ji yatra 2020.(Post Yatra) | 18.00 | 18.00 | Work completed |
15 | Installation of gabbion mesh on timber post on Dumail-sansanitop track from Km 2.5 to Km 4 for Shri Amarnath Ji yatra 2020. | 1.78 | 1.78 | Work completed |
16 | Installation of gabbion mesh on timber post on Dumail-sansanitop track from Km 4 to Km 6 for Shri Amarnath Ji yatra 2020. | 1.30 | 1.30 | Work completed |
Total Dumail to Sansanitop | 71.03 | 71.03 | ||
Kali Mata Track | ||||
1 | Removal of snow from Kali mata track b.w.o clearence of snow/snow avalanches from RD 0-3500 for Shri Amarnath Ji yatra 2020 | 0.83 | 0.83 | Work completed |
2 | Restoration of kali Mata Track b.w.o clearance of slips, protection works, lanching and repair of 03-No.bridges and allied works at required spots for Shri Amarnath Ji yatra 2020 RD 0-800 Mtrs. | 3.80 | 3.80 | Work completed |
3 | Restoration of kali Mata Track b.w.o clearance of slips, protection works, lanching and repair of 01-No.bridge and allied works at required spots for Shri Amarnath Ji yatra 2020 RD800-1600 Mtrs. | 4.43 | 4.43 | Work completed |
4 | Restoration of kali Mata Track b.w.o clearance of slips, protection works, lanching and repair of 03-No. bridges and allied works at required spots for Shri Amarnath Ji yatra 2020 RD1600-3200 Mtrs. | 2.80 | 2.80 | Work completed |
Total Kali Mata Track | 11.86 | 11.86 | ||
Railling Works | ||||
1 | Supply of pannel/pedestral made out of ISMC channels 75x40 mm & 100x50 mm of required size and specipication of M.S pipes, 40 mm dia incl. cutting welding incl. Cost of carriage, washer, nut and bolts for Shri Amarnath Ji yatra 2020( for a length of 2 Kms.(Supply upto Stores).Incl. fixing of same.(RD 3000-6000 &6000-8000) Mtrs.Agg.length=1.5Km +0.5 Km) | 97.50 | 97.50 | Work completed |
2 | Errection of safety railing at vulnerable spots incl. fixing of old posts, pipes , Painting & concreting etc on Kali mata track from RD 0-3500 Mtr. For Shri Amarnath Ji yatra 2020.(Linear Length=2 Kms) material to be taken from near by site.(Part B) Concreting to railings including strengthening | 5.75 | 5.75 | Work completed |
3 | Errection of safety railing at vurnable spots incl. fixing of old posts, pipes, Painting & concreting etc on Dumail-Sansani top track from RD 0-3000 Mtr. For Shri Amarnath Ji yatra 2020.(2.00 Kms out of which 1.00 Km material available at site & 1.00 Km to be taken from Store).(Part B) Concreting to railings including strengthening | 7.50 | 7.50 | Work completed |
4 | Errection of safety railing at vurnable spots incl. fixing of old posts, pipes ,Painting & concreting etc on Dumail-Sansani top track from RD 3000-6000 Mtr. For Shri Amarnath Ji yatra 2020.(1.5 Kms.material to be taken from near by site).(Part B) Concreting to railings including strengthening | 8.00 | 8.00 | Work completed |
5 | Errection of safety railing at vurnable spots incl. fixing of old posts, pipes Painting & concreting etc on Dumail-Sansani top track from RD 6000-8000 Mtr. For Shri Amarnath Ji yatra 2020.(1.00 Km material to be taken from near by site). (Part B) Concreting to railings including strengthening | 6.00 | 6.00 | Work completed |
6 | Errection of safety railing at vurnable spots incl. fixing of old posts, pipes ,Painting & concreting etc on Dumail-Sansani top track from RD 8000-10500 Mtr. For Shri Amarnath Ji yatra 2020. (2 Kms material to be taken from near by site). (Part B) Concreting to railings including strengthening | 7.00 | 7.00 | Work completed |
Total Railling Works | 131.75 | 131.75 | ||
Other allied works | ||||
1 | Manufacturing, providing and installation of Retro reflectized signage system on roads during Yatra-2020 | 9.00 | 9.00 | Work completed |
2 | Supply of ponies pre, during, and post Yatra for inspection on track by staff incl. visit of officers on track during Yatra-2020 | 4.00 | 4.00 | Work completed |
3 | Arrangement/supply of vehicle for inspection of staff at various sites during Yatra-2020 | 2.00 | 2.00 | Work completed |
4 | Consultancy charges for framing of DPR for stability of Hill slopes around Holy cave and Km 3rd to Km 6th of Dumail sansanitop track | 9.50 | 9.50 | Work completed |
Total allied works | 24.50 | 24.50 | ||
Total Ganderbal Division | 281.13 | 281.13 | ||
1 | Arrangement at Transit accommodation camp at Panthachowk | 5.96 | 5.96 | Work completed |
Total | 5.96 | 5.96 | ||
Pahalgam Side | ||||
2 | Making necessary arrangements for Shri Amarnath Yatra 2020 at FCI Godown Mir Bazar Anantnag | 6.00 | 6.00 | Work completed |
Total Khanabal Division | 6.00 | 6.00 | ||
Total new proposal 2020-21 | 293.09 | 293.09 | ||
B | Unpaid work done liability 2019-20 | |||
1 | Maintenance of Pahalgam/Chandanwari road incld. restoration of damaged spots at Chandanwari Camp of Shri SANY | 92.00 | 92.00 | Work completed |
2 | Upgradation of yard/inner roads bwo GSB filling incld. P/L of WBM G-II in paremises of Walnut Factory at Qazigund | 8.77 | 8.77 | Work completed |
3 | Face lifting bwo painting/distempering R&B Residential Quarter & SDPO's Office incld repairs to railing & bathrooms | 1.08 | 1.08 | Work completed |
4 | Construction of 01 No. Room with 02 No washrooms & varanda (Yatra facilitation centre) at Jawahar Tunnel (Qazigund side) | 6.19 | 6.19 | Work completed |
5 | Construction of parking place bwo GSB filling & P/L of WBM G-II at Lower Munda near Zig | 5.18 | 5.18 | Work completed |
6 | Furnishing bwo thermocool and axcel matting R&B to Residential & PHC at Lower Munda | 0.59 | 0.59 | Work completed |
7 | Construction of dropage at Bonigam junction, improvement to road surface bwo nallah muck filling in the premises of Migrant Colony at Vessu | 1.54 | 1.54 | Work completed |
8 | Refilling of nallah much/RBM including extra filling for providing entry/exit for vehicles of Industrial Estate Vessu | 0.65 | 0.65 | Work completed |
9 | Arrangement of Shri Amarnathji Yatra transit camp 2019 by way of CGI sheds at Pantha Chowk Srinagar (constrution of additional sheds by Construction Division 1st Srinagar) | 29.08 | 29.08 | Work completed |
10 | Constr.of temporary barracks/sentry posts for accomodating of incoming security forces for SANJY 2019-20 at Shadipora camp and indoor stadium Shadipora/ training ground near 14 BN CRPF | 30.12 | 30.12 | Work completed |
Total work done liability 2019-20 | 175.20 | 175.20 | ||
G.TOTAL | 468.29 | 468.29 |